01/18/2012
Diesner Aluminiumgießerei (DIAG) has very recently implemented a tailored simulation software application for mould filling and calculating temperature ranges and hardening times in its production process. This has led not only to an increase in process safety and reliability, but also simultaneously to considerably shortened production times and reduced development costs.
The practice-based simulation of casting processes allows problem areas to be identified already in the early stages of the production process, and corrections to be made as quickly as possible during the design of dies. By taking advantage of the ability to exclude errors already during the simulation phase, it is also possible to avoid the dangers that result from subsequent optimisation in the casting tools. Furthermore, initial calculations indicate that time savings of up to 15 percent are possible. Ideally this means that the entire process, from the start of development to the finished, installation-ready product, would take less than 20 working days for all conventional aluminium alloys, non-ferrous metals and refined zinc.
other story of the company This e-mail address is being protected from spambots. You need JavaScript enabled to view it

In our Trade Fair portal you find information about the industrial Trade Fairs of the year.